Products
面书号 2025-01-19 12:48 9
1. 对安全生产保证体系运行过程中出现的不符合要素、施工中出现的隐患制定纠正和预防措施,并对措施的落实情况进行复查。
1. Formulate corrective and preventive measures for elements that are not in compliance during the operation of the safety production assurance system, and for hidden dangers that arise during construction. Conduct follow-up reviews to ensure the implementation of these measures.
2. 建筑施工企业必须严格执行相关法律法规要求,严格按照相关规定内容对工人进行安全生产教育培训,同时各级安全生产主管部门必须严格执法,加强对建筑施工企业安全生产教育培训特别是对农民工的培训进行监督,真正做到有法必依、执法必严,才能确保建筑企业安全教育培训工作的实效性,才能够实现安全生产。
2. Construction companies must strictly comply with the relevant laws and regulations, and strictly follow the specific content of the regulations to provide safety production training and education for workers. At the same time, all safety production supervision departments at various levels must strictly enforce the law, strengthen supervision over the safety production training and education of construction companies, especially the training of migrant workers, and truly ensure that laws are strictly followed and laws are strictly enforced. Only in this way can the effectiveness of safety production training and education in construction companies be guaranteed, and only then can safety production be achieved.
3. ②研发项目:预计下周发标,需要高度重视,此项目涉及到分公司明年发展的问题,不能有任何闪失,志在必得。分公司领导全力支持,人员调配方面如有需要,可及时请示吴经理协调。(责任部门:市场部)
3. ② Research and Development Project: It is expected to release the bid next week, and this matter requires high attention. The project is related to the branch office's development next year and cannot afford any mishaps; we are determined to win. The branch office leadership fully supports this project. In case of any need for personnel allocation, please promptly report to Manager Wu for coordination. (Responsible Department: Marketing Department)
4. ⑸ 工地的三级安全教育指什么
4. ⑸ What does the third-level safety education on the construction site refer to?
5. 会议由项目监理部总监理工程师主持,首先由中国中铁郑州轨道交通2号线一期土建01工区经理部、施工监控中心分别汇报本周工程进展情况和下周工程计划安排及需协调的问题,驻地办对工程进展情况作出分析评价,总监办对上周施工中质量和安全文明施工的不足之处给予指出,最后总监办及业主对以后工作提出明确的要求。
5. The meeting was presided over by the Director of the Project Supervision Department. The meeting started with reports from the Management Department of the Civil Construction 01 Work Area of the China Railway Second Group Co., Ltd. for the Zhengzhou Metro Line 2 Phase I project and the Construction Monitoring Center on the progress of the project this week, the planning and arrangement of the next week's project, and issues requiring coordination. The Resident Office provided an analysis and evaluation of the project progress. The Director's Office pointed out the shortcomings in quality and safety and civilized construction during last week's construction. Finally, the Director's Office and the owner put forward clear requirements for future work.
6. ①项目盘点:为了更好、更有效的防控风险,财务部从明天开始国开行项目的盘点工作,盘点其已经进入现场(或发生)的物资、材料、劳务等形成的价款。同时理清截止到春节,还要相应发生的数目。在此基础上,审核确定项目的资金使用计划(资金计划要考虑给节后复工预留充沛的资金)。(此项工作财务部务必要在本月30日前完成)
6. ① Project Inventory: In order to better and more effectively prevent and control risks, the Finance Department will begin the inventory of the CDB (China Development Bank) project from tomorrow. The inventory will cover the prices formed by the materials, supplies, labor, and other items that have already been delivered to the site (or have occurred). At the same time, it will clarify the corresponding amounts that need to be incurred by the Spring Festival. Based on this, the financial department will review and determine the project's capital expenditure plan (the capital plan should consider reserving sufficient funds for resuming work after the holiday). (This task must be completed by the Finance Department before the 30th of this month.)
7. 周例会是在短周期内进行工作布置与总结的会议形式,为本次的周例会做一个会议纪要,本文是我为大家整理的周例会的会议纪要范文,仅供参考。
7. The weekly meeting is a form of meeting used for work arrangement and summary within a short cycle. This is to provide a meeting minutes for the current weekly meeting. The following is a sample of the meeting minutes for the weekly meeting that I have compiled for you, for your reference only.
8. 森林防火期,严禁带火上山。
8. During the forest fire prevention period, it is strictly prohibited to carry fire onto the mountain.
9. 《营销高手会夸人》,文章告诉大家良言一句三春暖,恶语伤人六月寒的道理,平时在沟通的过程中要注意沟通的技巧、注意沟通的语气和腔调,注意说话沟通的方式和效果。希望大家平时要多看书、多学习,大家共勉、一起进步。
9. "The Art of Flattery in Marketing," the article teaches us the principle that a kind word can warm up the three springs, while harsh words can chill the six months. It emphasizes that during daily communication, we should pay attention to the skills of communication, the tone and intonation of speech, and the way and effect of speaking. It is hoped that everyone will read more books and learn more in their daily lives, encouraging each other and making progress together.
10. 注:每次安全教育必须要有记录,主讲人,地点,时间,被培训人签名,培训课时,超过50人的班组可班组长代签,且要按安全教育培训计划完成课时。
10. Note: There must be a record for each safety education session, including the instructor, location, time, signature of the trainees, training hours. For teams with more than 50 people, the team leader can sign on behalf of the team, and the training hours must be completed according to the safety education and training plan.
11. ;在第二级控制网的基础上再按10m内分为三级方格网,组成方格网状控制,以满足场区控制的测设要求。在铺装施工中根据矩形网外轮廓线加密桩位,将控制桩投测至施工区,钉测钎,每测定一闭合图形完毕后进行闭合校核。 3212广场高程控制:由测绘院沿广场四周布设国家二等水准网,作为首级高程控制网。施工单位根据测绘院提供的水准点高程,按国家三等水准测量技术要求,在施工区用闭合水准测法加密布设高程控制点。首先计算出广场等高线的最大坡度线与小方格网边线交点高程,作为施测数据资料,制成表格形式,并采
11. Based on the second-level control network, a three-level grid system is further divided within a 10m radius, forming a grid control system to meet the survey requirements for the site control. During the paving construction, the control piles are densified along the outer contour lines of the rectangular grid, and the control piles are projected into the construction area, with stakes driven for measurement. After each closed figure is measured, a closure check is performed. Elevation control of 3212 Square: The Survey Institute sets up a national second-class leveling network around the square as the primary elevation control network. The construction unit, based on the elevation of the leveling points provided by the Survey Institute, and according to the technical requirements of national third-class leveling measurements, uses the closed leveling method to densify and set up elevation control points in the construction area. Firstly, calculate the elevation of the intersection point between the maximum slope line of the contour lines of the square and the edge line of the small grid, as the measurement data, prepared in tabular form, and collect...
12. 严防森林火灾,保护绿色成果。
12. Strictly prevent forest fires and protect the green achievements.
13. 森林如母,育你育我;火灾如敌,害人害己。
13. The forest is like a mother, nurturing both you and me; fires are like enemies, harming both people and oneself.
14. 十年树木皆辛苦,一朝失火前功弃。
14. Ten years of planting trees are all hard work, but once a fire breaks out, all the previous efforts are wasted.
15. 继续加大力度安排下乡工作,加大力度宣传本院知名度,让附近百姓了解知晓我院才有可能来医院就医,请各科配合医院宣传科工作。
15. Continue to increase efforts in organizing rural work and promote the popularity of our hospital. Let the local people around us know about our hospital so that they can seek medical treatment here. Please ask all departments to cooperate with the hospital's publicity department.
16. 3的干硬性水泥砂浆,干硬程度以手捏成团,落地即散为宜,用木抹子趟平后运放石材初就位,然后试夯石材至设计高程。如通过试夯发现砂浆的厚度偏差过大,则抬起石材调整砂浆的厚度。 324石材铺装:石材铺装前应根据广场平面网格控制图中的编号、图案,在十字控制线交点开始铺装。在初找平的干硬性砂浆上,满浇一层水灰比为05的素水泥浆(用浆壶浇均匀),然后安放石材,安放时四角同时下落,石材安放后调整石材位置,用大锤(要求在石材表面垫放橡胶垫)、木夯相互配合,锤击石材,使其达到设计高程和平整度、相邻板高差的质量要求,在锤击过程中要注意随时调整石材的位置,保持经纬方向的顺直。铺完纵、横行之后有了标准,可分段分区依次铺砌。 325石材拼缝填充:在石材铺砌后1-2昼夜进行灌缝。石材拼缝采用1:10的水泥干砂灌缝、扫缝填充。灌完缝后对铺砌完成的广场砖进行全面积的浇水,使石材拼缝中的干水泥砂充分下沉密实后,进行二次灌缝。
16. The dry, hard cement mortar with a consistency suitable for hand-squeezing into a ball that falls apart upon release. After applying it with a wood trowel and placing the stone materials into their initial position, test-tamp the stones to the designed elevation. If, upon testing, it is found that the mortar thickness varies too greatly, lift the stone and adjust the mortar thickness. 324 Stone paving: Before laying the stones, refer to the numbering and patterns in the square grid control plan of the plaza. Begin paving at the intersections of the cross control lines. On the initially leveled dry, hard mortar, pour a layer of plain cement slurry with a water-cement ratio of 0.5 (using a slurry pot to ensure even distribution), then place the stones, making sure all four corners are lowered simultaneously. After placing the stones, adjust their positions, using a sledgehammer (with rubber pads placed under the stone surface) and a wooden tamper to cooperate, striking the stones to achieve the designed elevation, flatness, and quality requirements for the height difference between adjacent slabs. During the striking process, pay attention to adjusting the stone positions to maintain straightness in the north-south and east-west directions. Once the longitudinal and transverse rows are completed, standards are set, and paving can be done in sections or zones in sequence. 325 Stone joint filling: Perform grouting between the stone joints 1-2 days after laying the stones. Use a 1:10 cement-dry sand mixture to fill and sweep the joints. After grouting, water the paved plaza area completely to allow the dry cement sand in the stone joints to settle and compact. Then, perform a second grouting.
17. 地 点:行政会议室 主 持:牛国民 记录人:马伟杰 参会人:临床、医技、护理及行政科室负责人
17. Venue: Administrative Conference Room Chairperson: Niuguo Min Recorder: Ma Weijie Attendees: Heads of clinical, technical, nursing, and administrative departments
18. 广播台站:本周施工现场安全文明施工处于可控状态,但以下方面存在安全隐患,要及本周安监站检查中提出围挡大门口覆土未清理,时整改:○泵车施工后空气中漂浮着大量灰2检查民工宿舍时发现大量电线私拉乱扯使用大功率用电尘,车站内排水沟存在大量垃圾;○3钢支撑吊装过程中发现吊装作业队把钢支撑放在设备并无防火措施,容易产生火灾隐患;○混凝土支撑之上。
18. Broadcasting stations: This week, the safety and civilized construction status at the construction site is under control, but there are potential safety hazards in the following aspects, which need to be rectified in time during this week's safety supervision station inspection: ○ After the concrete pump truck construction, a large amount of dust floats in the air; 2. When inspecting the workers' dormitories, a large number of privately pulled and tangled electric wires were found, using high-power electricity, and there is a large amount of garbage in the drainage ditches inside the station; ○ 3. During the steel support hoisting process, it was found that the hoisting team placed the steel support on top of the equipment without any fire prevention measures, which is easy to produce fire hazards; ○ above the concrete support.
19. 建筑企业安全教育的内容包括:安全生产思想教育、安全知识教育、安全技能教育。
19. The content of safety education for construction enterprises includes: safety production ideology education, safety knowledge education, and safety skill education.
20. 进行本工种岗位安全操作及班组安全制度、纪律教育。
20. Conduct safety operation training for the post in this occupation and education on the safety regulations and discipline of the team.
21. 主持人: 总经理
21. Moderator: General Manager
22. 天天宣传天天安,日日防火日日宁。
22. Everyday propaganda, everyday peace; daily fire prevention, daily tranquility.
23. 我国安全生产管理的方针是“安全第一,预防为主”。安全第一,就是说在一切生产活动中要把安全工作放在首要位置;预防为主,是指在一切生产活动开始之前针对生产活动的特点,对生产要素采取科学管理手段和措施,有效地控制不安全因素的发展和扩大,把事故消灭在萌芽状态,防患于未然。
23. The principle of safety production management in our country is "safety first, prevention为主." "Safety first" means that in all production activities, safety work should be given top priority; "prevention为主" refers to the scientific management methods and measures taken before the start of all production activities, according to the characteristics of the production activities, to control the development and expansion of unsafe factors effectively, to eliminate accidents at their nascent stage, and to prevent accidents before they occur.
24. 时 间:8月30日下午15:30;
24. Time: 3:30 PM on August 30th.
25. 设计变更及洽商记录。 79其它技术文件。 8安全、环保措施
25. Record of Design Changes and Negotiations. 79 Other Technical Documents. 8 Safety and Environmental Protection Measures.
26. ③假发票问题:财务部要加强检查,发现劳务假发票要暂停付款,待问题妥善解决后在恢复支付(责任部门:财务部)。
26. ③ Fake invoice issue: The Finance Department should strengthen inspections, and payment should be suspended upon discovery of fake service invoices. Payments will be resumed after the issue is properly resolved (responsible department: Finance Department).
27. 冬季已到,切莫为了防寒封堵消防疏散出口。
27. Winter has arrived, do not block fire evacuation exits for the sake of keeping warm.
28. 评委:建议确定好评委,可设一个投票箱由大家对节目进行品评,要将晚会举办成群众性的活动,而不是几个人的游戏,要充分体现群众互动性、全员参与性。
28. Judges: It is recommended to identify commendable judges and set up a ballot box for everyone to critique the program. The evening gala should be organized as a mass event, not just a game for a few people, and it should fully reflect the interactive nature and participation of the whole group.
29. 测量放线→砼基层处理→铺砌砂浆初找平、铺石材初找平
29. Surveying and stakeout → Treatment of concrete subgrade → Initial leveling with mortar for paving, initial leveling with stone paving
30. 生态家园保护好,森林防火少不了。
30. To protect the ecological home, forest fire prevention is indispensable.
31. 项目经理部教育内容:工地安全制度、施工现场环境、工程施工特点及可能存在的不安全因素等(每年不少于24时培训)
31. Project Management Department's Educational Content: Construction site safety system, on-site working environment, characteristics of engineering construction, and potential unsafe factors, etc. (at least 24 hours of training per year)
32. 火灾是森林的大敌。
32. Fire is a great enemy of forests.
33. 一颗树木十年才成材,一根火柴瞬间可毁树。
33. It takes a tree ten years to mature, but a match can destroy it in an instant.
34. 安全领导小组拟订落实安全管理目标,制定安全保证计划,根据保证计划的要求,落实资源的配置。
34. The safety leadership team formulates the implementation of safety management objectives, develops a safety assurance plan, and allocates resources in accordance with the requirements of the assurance plan.
35. 本周施工监测项目中:桩顶水平位移、桩体水平变形、支撑轴力变化值、坑外水位变化、地表沉降、建筑物沉降、地下管线沉降累计变化值没有出现明显变化,变化速率没有出现突变情况,广播台站基坑周边地表、建筑物、管线的沉降量均在安全控制范围之内,基坑桩体变形及支撑的受力状态处于安全控制范围之内;但盾构始发井西侧围护桩间渗漏影响,变形还处于持续过程之中,钢支撑轴力一直处于减小趋势,施工单位必须引起高度注意,加快桩间堵漏进度并密切关注每天变化值。
35. In this week's construction monitoring projects: there was no significant change in the horizontal displacement of the pile tops, the horizontal deformation of the pile bodies, the change in the supporting axial force, the change in the water level outside the pit, the surface subsidence, the building subsidence, and the cumulative change in the subsidence of underground pipelines. There was no sudden change in the rate of change. The subsidence of the ground surface, buildings, and pipelines around the pit of the broadcasting station is within the safe control range. The deformation of the pile bodies in the pit and the stress state of the supports are within the safe control range; however, due to the leakage between the retaining piles on the west side of the shield tunnel starting well, the deformation is still in a continuous process. The axial force of the steel supports has been on a decreasing trend. The construction unit must pay high attention to this, accelerate the progress of plugging the leaks between the piles, and closely monitor the daily change values.
36. ⑶ 建筑施工安全教育都是什么
36. ③ What is the safety education for construction work?
37. 必须抓紧落实接地网检测单位(要求必须施工一段检测一段,否则不得进入下道工序施工);
37. It is essential to promptly implement the testing of the grounding grid units (requirement: testing must be carried out for a section of construction before moving on to the next construction process);
38. 安全防火,人人有责。
38. Fire safety is the responsibility of everyone.
39. 三级安全教育要有执行制度,培训计划,三级教育内容、时间及考核结果要有记录。按有关规定:
39. There should be an implementation system for the three-level safety education, with records of the training plan, the content, time, and assessment results of the three-level education. According to the relevant regulations: